Dive Rite O2ptima Guía de usuario Pagina 44

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 45
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 43
O2ptima Pre Dive Check List
Name: _________________________________ Date of dive: ____/____/____
Rig ID: ______________ Sensor S/N: (1) _____________ (2) ______________ (3) _______________
BATTERY
DATA:
PRIMARY SECONDARY
DATE
INSTALLED
Table 1
Dive start time: _________ Stop time: _________
Initials Note: Initial only when task has been performed.
____ 1. Inspect all parts for dirt, deterioration, damage, and lubrication during assembly.
____ 2. Charge O
2
and diluent cylinders. Analyze Oxygen ________ (98.0% Minimum).
____ 3. Analyze diluent and bailout/deco cylinders if using mixed gas. Dil _______
(O2/HE) Bailout/deco 1 _______ 2________ 3________
____ 4. Install O
2
and diluent 1st stage assemblies and mount cylinders if necessary
____ 5. Install BC and bladder.
____ 6. Mount counter lungs.
____ 7. Install ADV, low pressure supply hoses to counterlungs and secure all hoses to harness assy.
____ 8. Conduct a breathing check on check valves in DSV assembly.
____ 9. Install DSV assembly to counterlungs.
____ 10. Install CO
2
canister.
____ 11. Install O
2
supply hose to O
2
supply intake
____ 12. Inspect CO
2
canister O-ring s
____ 13. Inspect sensors and sensor wires.
____ 14. Record accumulated service time on CO
2
absorbent: cartridge ____ min. (____:____)
____ 15. Replace Extend Air Cartridge if needed.
____ 16. Positive pressure test (5 min test)
____ 17. Inspect battery connectors and battery housings.
____ 18. Power on primary and secondary power supplies.
____ 19. Check O2 PRIMARY sensor in ambient air in system monitor S-1______S-2______S-3______
____ 20. Check O2 SECONDARY sensor in ambient air in system monitor S-1______S-2______S-3______
____ 21. Verify solenoid operation and display operation .
____ 22. Check HUD
____ 23. Inspect all hand tight fittings.
____ 24. Open O
2
and diluent cylinder valves.
____ 25. Verify O
2
and diluent manual valve operation.
____ 26. Verify automatic diluent addition valve operation (Only for C2R with option).
____ 27. Record cylinder pressures (PSI/BAR) O
2
: ________ Diluent: ________
____ 28. Close O
2
and diluent valves. Wait 2 min. then record pressures: (PSI/BAR) O
2
: ______ Diluent: ______
____ 29. Perform negative pressure test (30 sec. test).
____ 30. Complete calibration if necessary (See operation manual). (Note highest sensor mv for final O2 flush)
____ 31.. Perform breathing test to verify set point operation (0.7).
____ 32. Secure displays to back plate assembly.
____ 33.Note: If the performance of any of the above tasks is in question or the performance/operation of the
CCR is in question, do not dive the CCR!
Diver: ___________________________________________
Vista de pagina 43
1 2 ... 39 40 41 42 43 44 45

Comentarios a estos manuales

Sin comentarios