Dive Rite O2ptima Guía de usuario Pagina 45

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 45
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 44
O2ptima Post Dive Check List
Date of -dive: ____/____/____
Dive start time: _________ Stop time: _________
Initials Note: Initial only when task has been performed.
____ 1. Rinse CCR in fresh water.
____ 2. Record cylinder pressures O
2
, ______PSI/BAR Diluent: ______ PSI/BAR
____ 3. Secure O
2
and diluent cylinders and bleed down system via bypass valves.
____ 4. Disconnect all L.P. hoses, ADV, and displays from various assemblies.
____ 5. Remove DSV assembly from counterlungs . Rinse and disinfect.
____ 6. Rinse counterlungs and disinfect. Hang to dry upside down.
____ 7. Remove back plate assembly and BC.
____ 8. Remove lid assembly from canister.
____ 9. Remove and store Extend Air cartridge
____ 10. Wipe down lid assembly .
____ 11. /Disinfect inside canister.
____ 12. Remove and fill O
2
and diluent cylinders.
____ 13. Record accumulated CO
2
cartridge absorption time in Table 2.
____ 14. If scrubber absorbent service time expired, remove scrubber and dump. Rinse scrubber canister
If necessary.
____ 15. Record Scrubber and battery operational time in Table 2.
____ 16. Record maximum depth ___________ (ft/m) and total runtime __________min (or ____:____) since pre-
dive.
____ 17. Make sure power has turned off to the primary and secondary hand sets.
Accumulated
Time:
Previous This
Dive
Total
Used
Time
Allowed
Time
Remaining
Primary
Battery
Secondary
Battery
ExtendAir
Cartridge
Table 2
Remarks:
Diver: _________________________________________
Vista de pagina 44
1 2 ... 40 41 42 43 44 45

Comentarios a estos manuales

Sin comentarios